The issues arising when concrete batching plant unloading There will be some issues happened when start the unloading warehouse, when the pneumatic valve of the discharge bin is opened, the discharge bin will open automatically, then how to solve this problem, our staff will give you some suggestions.Generally, in such cases, the main reason is that the air pressure in the pneumatic valve is not enough,caused the lack of motivation on both sides of the pneumatic valve. And it will influence the discharging speed when the discharging door was opened unevenly, then it needs air compressor to adjust, and another reason, there is no time to add oil pneumatic value, so it would cause the insufficient activity, and the pressure is hard to keep up.Sometimes, the stone is quite different. There are distinctions between large and small. It will be blocked by mixing products, and caused the door can not be opened. When you knock on the door, and the let the aggregates falling out from the gap of discharge port.Then it will open the discharging door easily, and not going to affect the process of the project.
JZC Concrete Mixer
Capacity: 10 - 25mΒ³/h
Power: 10 - 30KW
0 Comment