1. Clean up dust and concrete residue inside and outside the mixing drum,unloading mouth,mixing shaft and unloading door. Clean up with water, and add a small amount of stone and water then release after stirring a few minutes when necessary. Clean the vehicle, additive tank and its supply system with water.
2. Put off the residual water and additives in the pump,additive pump,water tank,additive tank and additive pipeline after work in freezing season.Prevent damage to the pump and its pipeline, and start the additional pump of the water pump for 1-2 minutes.
Double horizontal shaft forced concrete mixer has the characters of high efficiency,large capacity, strong mixing ability,good wear resistance and reasonable structure design. In a relatively short period of time the concrete components can be fully stirred evenly.