Concrete batching plant motor check and maintenance

The concrete batching plant needs to add oil to the motor of the concrete batching plant when it has worked for about 70 days. Basic repair is necessary for the concrete batching plant when it has worked for 150 days. The purpose is to know about the dust and bear of the machines.

When the concrete batching plant has produced 300 batches, it has to be checked and maintained.The production of the concrete batching plant is on schedule.If the production should be stopped for a long time,parts and accessories of the machine shall be properly protected.The motor should be set at the ventilation place and away from water and sunshine.

Pay close attention to the working condition of the motor in the concrete mixing station, and stop for maintenance in case of an abnormal situation.